PWHT is made of heating the metal following welding process in a very controlled manner for you to temperature below the 1st transformation point, soaking at that temperature for the sufficiently long occasion, and cooling in controlled rates.

About what temperature have that you heat up your metal?
This is determined by the properties in the metals. For steels, the phase change occurs with the first transformation temp or AC 1 for the Iron Carbide diagram. Temperatures should be below this. This could consist of 595 °C for you to 775 °C according to the alloying elements.

What on earth is the hold occasion?
This is more of an function of the thickness in the weld and generally is 15 minutes per 1” thickness with at the very least 1 hour.
The rate of air conditioning also has to allow for for macro structural alterations.

GUIDANCE NOTE 6 POST WELD HEAT TREATMENT OF WELDED STRUCTURES
Post weld heat treatment in the context. described here refers to the process of. reheating (1 to 2 hours) post weld. heat treatment on the carbide is generally
http://www.wtia.com.au/pdf/GN6%20PWHT.pdf

Post Weld Heat Treatment Services, PWHT Services for
PWHT Services – Provides Industrial post weld heat treatment services, PWHT Services, PWHT procedures for industrial equipments from Mumbai, India
http://www.industrial-inspection.in/pwht.htm

Services
Post Weld Heat Treatment (PWHT) is a controlled heating and cooling process This is particularly very true in the heat – affected zone adjacent to the weld metal deposit.
http://www.inspectest.com.pk/PWHT.htm

Post Weld Heat Treatment >
Post Weld Heat Treatment. Arrow Tank and Engineering has expanded its facilities with this Arrow Tank’s Heat Treatment Furnace uses natural gas as its primary
http://www.arrowtank.com/ArrowHeatTreat.htm

ESM Ch.13, GWS 1-08 Post Weld Heat Treatment
For ASME Section VIII, post weld heat treatment may be accomplished by heating the Any circumferential welds not previously post weld heat treated may be
http://engstandards.lanl.gov/esm/welding/vol1/GWS%201-08%20Procedure-R1.pdf

Furmanite ~~ Maximizing Asset Uptime
Why Use Post Weld Heat Treatment (PWHT)? Furmanite On-Site Field Post Weld Heat Treatment (PWHT) services are used frequently in the following applications.
http://www.furmanite.com/Services/ServiceDisplayPage/tabid/54/obj/253/lang/1/Default.aspx

BainitaHeat,PWHT Post Weld Heat Treatment (for Pressure
PWHT Services – Provides Industrial post weld heat treatment services, PWHT Services, PWHT procedures for industrial equipments from Mumbai, India